top of page

Half Bathroom Remodel

We installed new frame, insulation, drywall, access panel, vent, hot, cold, and waste lines, corner faucet, faucet fixtures, custom plumb rogh-in"s, tiles, toilet flange, toilet, floor, door trim, move electrical box, install light, mirror, pocket door, and locks.


5 views0 comments

Recent Posts

See All
bottom of page